|
Ongoing Jobs in Thanington Without
 |
Sign at Milton roundabout on entrance to Brett has been knocked down |
 |
Kerb stones and surface laying at the hanging bank lay-by (One Month) |
 |
Broken railings opposite the hanging banks lay-by (three month) |
 |
The speed sign which took Kent highways 10 months to put straight and was then move back within 72 hours |
|